Project Supervision according to AT&T May 4, 2009
Posted by yugten in AT&T.Tags: Alaska, AT&T, Code division multiple access, Evolved HSPA, gsm, HTC Corporation, iPhone, New Mexico
trackback
Network Coverage Area
There are a lot of projects going on in the AT&T Network especially in the wireless group which we called AT&T Mobility. AT&T Mobility is huge in terms of wireless subscribers. As of this date there are 62M subscribers nationwide covering four (4) regions/markets, namely: North East, South East, Central, and West. Below is the coverage area nationwide including Alaska, Hawaii and Puerto Rico/US Virgin Islands.
Legend:
AT&T National GSM Coverage
View 3G/Mobile Broadband coverage (in select areas)
My Region
The region where I belong is the West Region/Market which includes 12 states, namely: Alaska, Washington, Oregon, Idaho, Montana, Wyoming California, Nevada, Utah, Colorado, Arizona, and New Mexico. Tucson, AZ where the MSC is located and where I do my work.
Since I join the company all of the task of project supervision and overseeing vendor/contractors were assigned to me. Most of the projects are related to expansion of the network, upgrades on both software and hardware, local support, and coordination with vendor on site survey and inspection. The process of managing a project or what we call Change Request (CR) has different steps that must be undertaken to adhere to the AT&T standards.
AT&T Standards
Below is the checklist which we follow when a vendor or contractor can start a job in an AT&T premises.
Vendors and their contractors must all have a valid AT&T “RED CARD” or completed the AT&T Supplier Awareness Training.
AT&T “RED CARD” – Verify the expiration date.
AT&T Supplier Awareness Training – Verify via the AT&T Supplier Awareness Training database.
Vendor has read and signed the AT&T Mobility Switch Location Polices?
Attach AT&T Mobility Switch Location Polices signature sheet to back of Job Start Check List.
Night switch technician has reviewed the contractor sign-in log policy with contractor?
Vendor has “YELLOW” job folder on-site?
Vendor has an AT&T Engineering Design Package (EDP)?
Vendor has an AOTS Change Request Number?
The Switch Technician will enter the following information;
AOTS CR# ____________________________________
AOTS START DATE/TIME: _________________________________________
AOTS END DATE/TIME: ___________________________________________
Vendor has a signed “Vendor MOP”?
Dry Run Section of “VENDOR MOP “ is signed by the Implementation Engineer or Switch Manager?
By signing this document I am acknowledging that I have completed all of the above items.
_____________________ _____________________ _________________
Print Name Signature Date
Related Articles
- AT&T’s First 4G Phone Gets a Launch Date (mashable.com)
- AT&T highlights simultaneous voice, data in latest ads (electronista.com)
- AT&T gets aggressive with anti-Verizon iPhone ads (news.cnet.com)
Comments»
No comments yet — be the first.